Permits are opened and never closed
The close-out and post-work monitoring period is the part that matters. This permit will not close without a recorded final check.
A permit that controls the risk where it actually sits — not during the welding, but in the hour after everyone has packed up and left a smouldering ignition source behind a wall lining.
Instant download · Editable .docx
Hot work is not a statutorily permitted activity in New Zealand the way asbestos removal is licensed — there is no regulation that says you must hold a permit before you weld. The permit exists because insurers, principals and main contractors require it, and because the risk profile is unusual: the dangerous period frequently begins after the work has finished. A permit that is signed on and never signed off has controlled nothing.
The close-out and post-work monitoring period is the part that matters. This permit will not close without a recorded final check.
Naming a fire watch who is also doing the welding is not a control. The permit separates the roles and records both.
Sparks travel through penetrations, cavities and floor gaps. The pre-work assessment covers the other side of the wall, not just the work area.
Hot work in a confined space requires both permits. Do not substitute one for the other.
Word — 10 pages (permit + register + guidance) · Formats: DOCX
Hot work permitting is a control practice rather than a named statutory document. Its legal weight comes from the general risk-management duties and from the emergency-planning obligation it interacts with.
Written and reviewed by the occupational health and safety team at OH Consultant. Fixed safe-radius and monitoring-duration figures are deliberately not printed into the form. Those values are set by insurers, principals and standards that change, and a permit book asserting an out-of-date figure gives false assurance — the permit records what was applied and why.